ORDER
ON SHORTING POSTMAN
CHANGE IN DESIGNATION OF SORTING POSTMAN-CLARIFICATION.
Please
refer to this Directorate's letter of even number dated 04.05.2011 vide which
the post of Sorting Postman has been re-designated as Postman and both Postman
and Sorting Postman have been given a common generic designation Postman.
2. During
the meetings of the Staff Federations with the Secretary (Posts), the
Federations have raised following issues in connection with the implementation
of the ibid order in the fields:
(i) Circles
are either abolishing or redeploying the posts of Sorting Postman.
Such posts may be restored.
(ii) All the
Postman are being put on the job of Beat Sorting at a time.
3. This
is wrong interpretation and implementation of the said order of the
Directorate. Nowhere in the order is it mentioned that posts of Sorting Postman
are either to be abolished or redeployed and all the Postmen are to be put on
the Beat Sorting work at a time. In fact, the order is very lucid that post of
Sorting Postman is re-designated as Postman. Therefore, such abolished or redeployed posts of Sorting Postman may be restored
immediately. The designation of the existing Sorting Postman may not be changed.
4. Further,
in the third para of the aforesaid order, it is indicated that concerned
Divisional Head or Sr. Postmaster has to work out the exact requirement of Postmen
required for Beat Sorting on the basis of the total number un-registered mail
received for delivery as per the existing norms. Hence, concerned authorities
in the Division to decide the number of Postmen to be put on the Beat Sorting
job on the basis of existing norms. Thus, all the postmen are not to be
put on the Beat Sorting work at a time. Rather, each one of them should be
assigned the said job on turn-by-turn basis while observing the existing norms.
5. Further, the number of postmen deployed for Beat Sorting should be to ensure that Beat Sorting, is completed one hour before the postmen leave for delivery so that necessary documentations and procedural requirement could be completed, which are necessary for carrying out the delivery effectively.
6. It,
is therefore, requested to please look into the issue personally and ensure
correct and effective implementation of the Directorate's order dated
04.05.2011.
7. It
may please be accorded Top Priority.
This issues with the
approval of the Competent Authority.